On June 20, 2022, DASWELL sent one set of CPD40 diesel concrete pump and one set of BMM4-26 block making machine to the port.
On June 16, 2022, DASWELL delivered one set of CPD40 diesel concrete pump, one set of DMP50 diesel concrete mixer pump and 200m steel pipe to the port.
On June 9th, two sets of diesel engine concrete mixer with pump were loaded in our factory, and they will be shipped to Southeast Asia. Our concrete mixer with pump is very mature, it effectively avoids pipe blocking problems compared with other Chinese competitors.
On June 2nd, one set of 4.0m3 self loading concrete mixer was loaded in factory and will be delivered to Southeast Asia. It is loaded in one 40HQ container.
On May 31, 2022, DASWELL loaded one set of 50T bolted silo, one set of φ219, 9m screw conveyor, some rubber belt and some accessories into 1*40HQ container in our factory and delivered it to the port successfully. It will be shipped to Southeast Asia very soon.
On May 20, 2022, DASWELL loaded one set of BMM4-26 block making machine into a 20GP container and sent it to the port successfully. It will be shipped to Southeast Asia.
On April 27, 2022, DASWELL sent one set of 30m concrete boom pump to the port successfully. It will be loaded into a 40 flat rack at the port and will be shipped to Southeast Asia on April 30.
On May 17, 2022, DASWELL loaded one set of MCBP25 (25m3/h) mobile concrete batching plant into 2*40HQ container in our factory and delivered it to the port successfully.
On June 1st, 2022, DASWELL company loaded one set of 35-40t/h limestone crushing line into two 40ft high containers, we will ship it to Middle East customer.
On June 2nd, one set of 3.5m3 self loading mixer is loaded in one 40HQ container, it will be shipped to Southeast Asia. It is designed with front cabin, driver can observe the working conditions easily, very suitable for fresh driver.