Concrete mixer pump is being efficiently constructed in Indonesia

Introduction / Overview 

For an infrastructure project in Indonesia, the client selected the Daswell concrete mixer pump as core construction equipment. The project required mixing and transporting large quantities of concrete under tight deadlines and complex construction conditions. Our concrete mixer pump, combining mixing and pumping capabilities, efficiently mixes concrete and precisely delivers it to the construction site, significantly improving construction efficiency. We not only provided the client with stable, easy-to-operate equipment, but also dispatched a technical team to provide on-site guidance, commissioning, and operational training, ensuring smooth local operation and ensuring the project’s high-quality, on-time completion.

Concrete Mixer with Pump
Concrete Mixer with Pump

Customer Requirements

This Indonesian client, from the construction industry, primarily undertakes road, bridge, and civil engineering projects. This project, a rural-urban road connection project, faced a tight deadline and demanding a large volume of concrete pouring work to be completed in a short period of time. The remote location of the project site, which made transporting raw materials difficult, and the complex terrain posed challenges in ensuring a continuous supply of concrete. Therefore, the client required efficient equipment capable of both on-site mixing and direct pumping to reduce the time lost in manual handling and coordinating multiple equipment. The project’s large scale and high daily concrete demand demanded stable performance under prolonged, high-load operation.

This customer learned about Daswell through online research and peer recommendations. After browsing our official website and reviewing several overseas project examples, they contacted our sales team. After several conversations and technical consultations, the customer gained a thorough understanding of the Daswell trailer-type mixer pump’s performance, applicability, and after-sales support.

The customer ultimately chose Daswell for three key reasons:

  1. Excellent equipment performance.
  2. Extensive overseas experience.
  3. Comprehensive after-sales and technical support.

Equipment Provided 

1 mixer pump

Equipment Name: Concrete Mixer Pump

Model: DMP50

Capacity: 50m³

Rated power: 95kw

Total weight: 4600kg

Overall dimension: 5300*2150*2700mm

Quantity: 1 unit

1 box of accessories
1 box of ton bags
1 box of tapered pipes
40 pieces of 3-meter straight pipes
2 pieces of 2-meter straight pipes
2 pieces of 1-meter large bend pipes
1 piece of flexible hose

pipe 80 100 125

Installation & Commissioning

After the Daswell DMP50 mixer pump has completed production testing, it is safely transported to the customer’s construction site in a container. Our technical team arrives immediately to provide customers with full support. From equipment unloading, positioning, connecting the delivery pipe, to checking the hydraulic system and electronic control system, we strictly follow the installation process to ensure the stability and reliability of the equipment. After the installation is completed,our technicians conducted a comprehensive commissioning of the DMP50, including testing the mixing system, pumping pressure, and actual concrete delivery, to ensure that all parameters met construction requirements. Finally, we provided on-site operation and maintenance training for the client team, detailing key equipment usage tips, common troubleshooting methods, and routine maintenance techniques to ensure they could independently and efficiently operate the DMP50 on the jobsite.

Daswell concrete mixer pump woking site
Daswell concrete mixer pump woking site

Customer Feedback & Project Outcome 

After the DMP50 mixer pump was put into operation, the customer gave high praise to Daswell’s equipment and service. The customer said: “The equipment operates stably, pumping is smooth, and there is almost no pipe blockage, which greatly improves construction efficiency.” Compared with the previous method of using a split mixer and a trailer pump, the DMP50 combines mixing and pumping into one, which increases the concrete delivery speed by about 30% and shortens the construction period by nearly 20%. At the same time, due to the reduction of multiple equipment and additional operators, labor costs decreased by nearly 25%, and the overall input-output ratio was significantly improved, bringing higher profit margins to the project. The customer said that he would continue to cooperate with Daswell in the future and recommend our equipment to his peers.