On June 2nd, one set of 3.5m3 self loading mixer is loaded in one 40HQ container, it will be shipped to Southeast Asia. It is designed with front cabin, driver can observe the working conditions easily, very suitable for fresh driver.
On December 17, 2021, two CPD40 concrete trailer pumps from Daswell were tested and commissioned separately before leaving the factory, and then shipped to Shanghai port. And they were packed in the port and shipped to the Philippines on the 17th.
On January 26 this year, we Daswell Machinery has sold a stone crushing production line to Philippines, Southeast Asia. There are three jaw crusher machines, a vibrating screen, a control box and a sand washing machine in this production line.