50T Bolted Silo to Southeast Asia

On May 31, 2022, DASWELL loaded one set of 50T болт -силос, one set of φ219, 9m screw conveyor, some rubber belt and some accessories into 1*40HQ container in our factory and delivered it to the port successfully. It will be shipped to Southeast Asia very soon.

50T bolted silo delivering
50T bolted silo delivering

Силос на 50 т будет использоваться для CBP25 бетонное пакетное растение. It will be used to replace the cement breaker of the CBP25.

Связанное оборудование для машин

Похожие записи