On July 27, 2022, DASWELL sent one set of 6 cubic meters concrete mixer truck to the port. It will be loaded into one 40FR and shipped to Southeast Asia very soon.
On July 18, 2022, DASWELL delivered two set of CPD40 trailer pump, two set of DMP50 mixer pump, 400m steel pipe, and spare parts to the port.
On July 12, 2022, DASWELL loaded one complete set of CBP25 (25m3/h) stationary concrete batching plant into 2*40HQ container. It will be shipped to Southeast Asia very soon.
On July 18, 2022, DASWELL delivered one set of mobile stone crushing plant and weight bridge to the port successfully. The mobile stone crushing plant chassis will be loaded to bulk ship and the other parts will be loaded in to container. It will be shipped to Africa.
On July 5, 2022, DASWELL loaded another set of MCBP25 (25m3/h) mobile concrete batching plant into 2*40HQ container successfully. It will be shipped to Southeast Asia.
On June 9, 2022, DASWELL loaded one set of 3.5m3 self loading mixer into a 40HQ container. It will be shipped to Southeast Asia on June 16.
On June 27, 2022, DASWELL sent one set of PE600×900 jaw crusher, 2 sets of BMM4-26 block making machine and some spare parts to the port successfully.
On June 30, 2022, DASWELL loaded one set of MCBP25 (25m3/h) mobile concrete batching plant into 2*40HQ container successfully. It will be shipped to Southeast Asia.
On June 20, 2022, DASWELL sent one set of CPD40 diesel concrete pump and one set of BMM4-26 block making machine to the port.
On June 16, 2022, DASWELL delivered one set of CPD40 diesel concrete pump, one set of DMP50 diesel concrete mixer pump and 200m steel pipe to the port.