From June 19 to 21, 2023, the sales manager and engineers of our Egyptian branch participated in the coatings exhibition in Egypt.
On January 19th, 2023, three sets of self loading concrete mixer were delivered to Indonesia, one set of 3.5m3 capacity, two sets of 4m3 capacity.
On October 2, 2022, DASWELL loaded one set of WL2800 wheel loader, one set of horizontal feeder, some screen mesh and other spare parts into a 40HQ container. It will be shipped to Southeast Asia.
On December 22, 2022, our customer in Kazakhstan received the ordered SLDM3500 self loading mixer truck. The customer gave a high evaluation to our equipment.
On October 6th, 2022, one set of 3ZS1235 three-layer vibration screen and one set of dust collector were loaded in container and will be shipped to Algeria.
On October 2th, 2022, one set of 4m3 and one set of 3.5m3 self loading concrete mixer was delivered to Indonesia. It has the function of loading, mixing, transporting and unloading function.
On September 29, 2022, DASWELL loaded one set of MCBP25 mobile concrete batching plant into 2*40HQ container. It will be shipped to Southeast Asia on October 4.
On September 28, 2022, DASWELL loaded one set of PD400 water drilling rig and some spare parts into 1*40HQ container. It will be shipped to Southeast Asia on October 4.
On September 16, 2022, DASWELL sent one set of hand held wet shotcrete machine, one set of grout mixer and grout pump, 500 pieces of pallets and some spare parts to the port smoothly.