50T Bolted Silo to Southeast Asia

On May 31, 2022, DASWELL loaded one set of 50T Baut Silo, one set of φ219, 9m screw conveyor, some rubber belt and some accessories into 1*40HQ container in our factory and delivered it to the port successfully. It will be shipped to Southeast Asia very soon.

50T bolted silo delivering
50T bolted silo delivering

Silo Baut 50t akan digunakan untuk CBP25 tanaman batching beton. It will be used to replace the cement breaker of the CBP25.

Peralatan mesin terkait

Posting serupa