50t silo atornillado al sudeste asiático

On May 31, 2022, DASWELL loaded one set of 50T silo atornillado, one set of φ219, 9m screw conveyor, some rubber belt and some accessories into 1*40HQ container in our factory and delivered it to the port successfully. It will be shipped to Southeast Asia very soon.

50T bolted silo delivering
50T bolted silo delivering

El silo de 50t atornillado se utilizará para el CBP25 planta de lotes de concreto. It will be used to replace the cement breaker of the CBP25.

Equipo de maquinaria relacionada

Entradas Similares