On June 30, 2022, DASWELL loaded one set of MCBP25 (25m3/h) مصنع تجميع الخرسانة المتنقلة into 2*40HQ container successfully. It will be shipped to Southeast Asia.
هذا MCBP25 مصنع تجميع الخرسانة المتنقلة is composed of TCM500 twin shaft mixer, 4*4m3 aggregate bin, belt conveyor, weighing system and control system. It can produce about 25m3 concrete per hour. And it is mobile type. It is very suitable for medium projects with short construciton period. And after the project is done, it is easily to transport to other site.